Operatives in orange hi-vis spreading concrete on an indoor slab at night

More than 300 m³ placed on live construction projects

Deployments

Concretene precast railway sleepers

Global Centre of Rail Excellence

Low-carbon railway sleepers, South Wales

Precast sleepers developed under an Innovate UK-funded project and installed as a live demonstrator at the Global Centre of Rail Excellence.

Type
Precast
Year
2025
External concrete slab at Clough Cottage Farm

Clough Cottage Farm

External slab near Congleton, Cheshire

Readymix farmyard slabs poured as part of the UK supply chain scale-up project.

Type
Readymix
Year
2025
Mayfield Depot in Manchester

Escape to Freight Island

Mezzanine deck, Mayfield Depot, Manchester

One of the first scaled demonstrators, poured after Innovate UK testing reported 25–30% strength uplifts.

Type
Suspended deck
Year
2021
Pour of parking bays at the Graphene Engineering Innovation Centre

University of Manchester

Parking bays, Graphene Engineering Innovation Centre

External parking bays outside the GEIC, where Concretene runs its formulations lab.

Type
External hardstanding
Year
2021
Southern Quarter gym building in Amesbury

Southern Quarter

Gym floor slab, Amesbury, Wiltshire

A ground-bearing gym floor, among the first commercial slabs with graphene-enhanced concrete.

Type
Floor slab
Year
2021

From lab study to Series A

  1. 2019

    Initial R&D with the University of Manchester

    First study at the Graphene Engineering Innovation Centre shows promising results for cutting cement through better mechanical performance.

  2. 2020

    £378k Innovate UK grant

    GEIC membership and a joint project with the Department of Mechanical, Aerospace and Civil Engineering.

  3. 2021

    First at-scale pours

    More than 300 m³ placed in Wiltshire and Manchester.

  4. 2022

    £3.5m seed from LocalGlobe

    Equity partnerships with Arup and Black Swan Graphene; private formulations lab at the GEIC.

  5. 2023

    ~£2m more in UK government funding

    Supply chain, precast with Roger Bullivant, and railway sleepers with the Global Centre of Rail Excellence.

  6. 2024

    £3m Seed+ co-led by Molten and LocalGlobe

    Team grows to 18; readymix pours at scale with Breedon.

  7. 2025

    Live demonstrators and a pilot plant

    Sleepers in South Wales, farmyard slabs in Cheshire, 20+ people, pilot manufacturing in central Manchester.

  8. 2026

    £1m Ofwat funding and £4.5m Series A first close

    Biogas-to-graphene with United Utilities, Tarmac and Levidian; NPIF II, LocalGlobe and Molten back industrial-scale manufacture.

Leadership

Mike Harrison
Mike HarrisonChief Executive Officer
Dr Craig Dawson
Dr Craig DawsonChief Scientific Officer
Dave Evans
Dave EvansChief Financial Officer
Alex McDermott
Alex McDermottFounder
Alan Beck
Alan BeckHead of Product

Plan a trial pour with us

Graphene Engineering Innovation Centre
Sackville Street, Manchester M1 3BB
info@concretene.co.uk