
Global Centre of Rail Excellence
Low-carbon railway sleepers, South Wales
Precast sleepers developed under an Innovate UK-funded project and installed as a live demonstrator at the Global Centre of Rail Excellence.
- Type
- Precast
- Year
- 2025

Low-carbon railway sleepers, South Wales
Precast sleepers developed under an Innovate UK-funded project and installed as a live demonstrator at the Global Centre of Rail Excellence.

External slab near Congleton, Cheshire
Readymix farmyard slabs poured as part of the UK supply chain scale-up project.

Mezzanine deck, Mayfield Depot, Manchester
One of the first scaled demonstrators, poured after Innovate UK testing reported 25–30% strength uplifts.

Parking bays, Graphene Engineering Innovation Centre
External parking bays outside the GEIC, where Concretene runs its formulations lab.

Gym floor slab, Amesbury, Wiltshire
A ground-bearing gym floor, among the first commercial slabs with graphene-enhanced concrete.
First study at the Graphene Engineering Innovation Centre shows promising results for cutting cement through better mechanical performance.
GEIC membership and a joint project with the Department of Mechanical, Aerospace and Civil Engineering.
More than 300 m³ placed in Wiltshire and Manchester.
Equity partnerships with Arup and Black Swan Graphene; private formulations lab at the GEIC.
Supply chain, precast with Roger Bullivant, and railway sleepers with the Global Centre of Rail Excellence.
Team grows to 18; readymix pours at scale with Breedon.
Sleepers in South Wales, farmyard slabs in Cheshire, 20+ people, pilot manufacturing in central Manchester.
Biogas-to-graphene with United Utilities, Tarmac and Levidian; NPIF II, LocalGlobe and Molten back industrial-scale manufacture.




